TB Flats

TB Flats is a 503 MW wind farm in Carbon County, Wyoming, operated by PacifiCorp. EIA-860M lists 1 generating unit here. Its unit entered service in 2021.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
503.2 MW
503.2 MW net summer
Generating units
1
In service
2021
EIA plant ID
62516

Where it is

Loading map…
County
Carbon County, Wyoming
Coordinates
42.1772, -106.2341
Balancing authority
PACE
Sector
Electric Utility

Units, technology and status

Operator of record
PacifiCorp
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant PacifiCorp reports to EIA →

TB Flats: FAQ

Where is TB Flats?
In Carbon County, Wyoming (WY). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is TB Flats?
503 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns TB Flats?
EIA-860M names PacifiCorp as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as TB Flats LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — PacifiCorp here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "TB Flats LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is TB Flats still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.