Cedar Springs Wind IV

Cedar Springs Wind IV is a 390 MW wind farm in Converse County, Wyoming, operated by Cedar Springs Wind IV, LLC. EIA-860M lists 1 generating unit here. Its unit entered service in 2025.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
390.4 MW
390.4 MW net summer
Generating units
1
In service
2025
EIA plant ID
67289

Where it is

Loading map…
County
Converse County, Wyoming
Coordinates
43.1008, -105.7115
Balancing authority
WACM
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Cedar Springs Wind IV, LLC
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant Cedar Springs Wind IV, LLC reports to EIA →

Cedar Springs Wind IV: FAQ

Where is Cedar Springs Wind IV?
In Converse County, Wyoming (WY). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Cedar Springs Wind IV?
390 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Cedar Springs Wind IV?
EIA-860M names Cedar Springs Wind IV, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Cedar Springs Wind IV LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Cedar Springs Wind IV, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Cedar Springs Wind IV LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Cedar Springs Wind IV still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.