Data centers in Missouri

15 Missouri data centers across 3 cities. It is a floor on how many data centers are in Missouri, not a complete roster. Data updated 2026-09-17.

Updated 2026-09-17 · Source: county & city permit GIS, OpenStreetMap

Facilities on record
15
a floor, not a census
Cities
3
most in Kansas City
With permit detail
0
no county layer here
Published floor area
Not published

Map of data centers in Missouri

Loading map…

List of Missouri data centers

Sort by any column. Named facilities link to their own page; an unnamed facility is listed by its ID.

Data centers in Missouri
AT&TAT&TKirksville——
Black Rock Financial Management—Kansas City——
Carfax————
CenturyLink————
Genome Data CenterWashington University in St. LouisSaint Louis——
Meta Data CenterMeta———
Netrality Data Centers—Kansas City——
Netrality Data Centers—Saint Louis——
Patmos Hosting, Inc.Patmos Hosting, Inc.Kansas City——
Unnamed (OSM node 9861806598)————
Unnamed (OSM way 1433936352)————
Unnamed (OSM way 195165330)————
Unnamed (OSM way 195165354)————
Unnamed (OSM way 195169261)————
Unnamed (OSM way 288909509)—Kansas City——

Missouri data centers by city

  • Not reported8
  • Kansas City4
  • Saint Louis2
  • Kirksville1

Operators named in Missouri

As published. Operator and owner are often different companies and these records do not distinguish them.

  • AT&T1
  • Meta1
  • Patmos Hosting, Inc.1
  • Washington University in St. Louis1

The power behind Missouri's data centers

There are 140 operating power plants in Missouri totalling 23,689 MW of nameplate capacity, of which 34 are natural gas plants. That is the supply these 15 facilities draw on. No load is known for these data centres, so this page draws no line between the two — it only puts them in one place.

Data centers in Missouri: FAQ

How many data centers are in Missouri?
15 are listed in this directory. Missouri has no state register of data centres, so that is a lower bound rather than a count.
Where are the data centers in Missouri?
Mostly around Kansas City, which has more of these facilities than anywhere else in the state. The map above plots all 15 and the city table breaks them out.
Is there a data center near me in Missouri?
The city table below groups every listed facility by city, which is the quickest way to find the data center closest to a given town. This site does not read your location.
Are these AI data centers?
Unknown. A data center's tenant and workload are not disclosed, in Missouri or anywhere else. Where an AI data center exists in Missouri it is in this list without being labelled as one, and this page will not guess which.
Who operates Missouri data centers?
AT&T is listed against more of these facilities than any other operator. Where no operator is known the row says so rather than guessing one.
How many Missouri data centers are under construction or planned?
No build status is known for the Missouri facilities listed here, so this page shows none.
How current is this, and what is left out?
Data updated 2026-09-17. Power draw, tenant, commissioned megawatts and lease terms are not disclosed and are not shown anywhere on this site.