SR McNeal

SR McNeal is a 40 MW battery storage project in Cochise County, Arizona, operated by SR McNeal, LLC. EIA-860M lists 2 generating units here. Its units entered service in 2023.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
40 MW
40 MW net summer
Generating units
2
In service
2023
EIA plant ID
66925

Where it is

Loading map…
County
Cochise County, Arizona
Coordinates
31.5551, -109.7013
Balancing authority
TEPC
Sector
IPP Non-CHP

Units, technology and status

Operator of record
SR McNeal, LLC
Primary energy source
Battery
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Battery 20 MW, Solar 20 MW. It is filed here under Battery, the source with the most capacity.

Every plant SR McNeal, LLC reports to EIA →

SR McNeal: FAQ

Where is SR McNeal?
In Cochise County, Arizona (AZ). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is SR McNeal?
40 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns SR McNeal?
EIA-860M names SR McNeal, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as SR McNeal LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — SR McNeal, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "SR McNeal LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is SR McNeal still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.