Roadrunner Reserve Phase 1
Roadrunner Reserve Phase 1 is a 200 MW battery storage project in Pima County, Arizona, operated by Tucson Electric Power Co. It has 1 generating unit here. Its unit entered service in 2025.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 200 MW
- 200 MW net summer
- Generating units
- 1
- In service
- 2025
- Plant code
- 67905
Where it is
Loading map…
- County
- Pima County, Arizona
- Coordinates
- 32.0718, -110.8162
- Balancing authority
- TEPC
- Sector
- Electric Utility
Units, technology and status
- Operator of record
- Tucson Electric Power Co
- Primary energy source
- Battery
- Technologies
- Batteries
- Status
- Operating
Roadrunner Reserve Phase 1: FAQ
- Where is Roadrunner Reserve Phase 1?
- In Pima County, Arizona (AZ). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Roadrunner Reserve Phase 1?
- 200 MW of nameplate capacity across 1 unit, as of 2026-07.
- Who owns Roadrunner Reserve Phase 1?
- Tucson Electric Power Co is the operator of record. That is not always the ultimate owner.
- Is this the same as Roadrunner Reserve Phase 1 LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — Tucson Electric Power Co here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Roadrunner Reserve Phase 1 LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Roadrunner Reserve Phase 1 still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.