Pediment BESS I

Pediment BESS I is a 250 MW battery storage project in Maricopa County, Arizona, operated by Pediment BESS I LLC. EIA-860M lists 1 generating unit here. Its unit entered service in 2026.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
250 MW
250 MW net summer
Generating units
1
In service
2026
EIA plant ID
68477

Where it is

Loading map…
County
Maricopa County, Arizona
Coordinates
33.3557, -111.6021
Balancing authority
SRP
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Pediment BESS I LLC
Primary energy source
Battery
Technologies
Batteries
Status
Operating

Every plant Pediment BESS I LLC reports to EIA →

Pediment BESS I: FAQ

Where is Pediment BESS I?
In Maricopa County, Arizona (AZ). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Pediment BESS I?
250 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Pediment BESS I?
EIA-860M names Pediment BESS I LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Pediment BESS I LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Pediment BESS I LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Pediment BESS I LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Pediment BESS I still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.