Sun Pond

Sun Pond is a 170 MW battery storage project in Maricopa County, Arizona, operated by Sun Pond, LLC. EIA-860M lists 2 generating units here. Its units entered service in 2026.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
170 MW
170 MW net summer
Generating units
2
In service
2026
EIA plant ID
68492

Where it is

Loading map…
County
Maricopa County, Arizona
Coordinates
33.3812, -112.8216
Balancing authority
SRP
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Sun Pond, LLC
Primary energy source
Battery
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Battery 85 MW, Solar 85 MW. It is filed here under Battery, the source with the most capacity.

Every plant Sun Pond, LLC reports to EIA →

Sun Pond: FAQ

Where is Sun Pond?
In Maricopa County, Arizona (AZ). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Sun Pond?
170 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Sun Pond?
EIA-860M names Sun Pond, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Sun Pond LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Sun Pond, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Sun Pond LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Sun Pond still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.