Coal Power Plants in New Hampshire
Every operating coal power plant in New Hampshire as of 2026-07: 1 plants, 4 generating units and 496 MW of nameplate capacity across 1 county, most of it inside ISO New England.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Plants
- 1
- 4 generating units
- Nameplate capacity
- 496 MW
- Counties
- 1
- Grid operator
- ISO New England
- covers most of these plants
Map of coal power plants in New Hampshire
Every one of the 1 plants is drawn at its reported coordinates.
Loading map…
- Coal · 1
List of coal power plants in New Hampshire
Sort by any column. Capacity is nameplate, summed across every generating unit at the site.
| Merrimack2 technologies | Granite Shore Power | Merrimack | 496.4 | 4 | 1960 | Operating |
|---|
Largest coal power plants in New Hampshire
- 1MerrimackMerrimack County, New Hampshire496.4 MW
Coal power plants by county in New Hampshire
The county each plant sits in. It is the fastest way to find the plant nearest a given town.
| County | Plants | Nameplate MW |
|---|---|---|
| Merrimack | 1 | 496.4 |
Coal Power Plants in New Hampshire: FAQ
- How many coal power plants are in New Hampshire?
- 1, with 496 MW of nameplate capacity between them, spread over 1 county. That is the operating count as of 2026-07.
- Is there a map of New Hampshire coal power plants?
- Yes — the map above. Each dot is one coal power plant, sized by nameplate capacity and placed at its reported site.
- Which is the largest coal power plant in New Hampshire?
- Merrimack, at 496 MW. The table is sorted largest first, so the rest follow it.
- Is there a coal power plant near me in New Hampshire?
- The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
- Which grid operator runs New Hampshire's coal power plants?
- Most of them sit inside ISO New England, going by the balancing authority each plant is assigned to. Live conditions for that market are on this site.
- How current is this, and what is left out?
- Data as of 2026-07, updated monthly. Conventional steam coal and integrated gasification combined cycle. Plants below 1 MW are not included; retirements and additions after 2026-07 arrive with the next monthly update.