Stillwater Hydro Electric Project is a 3 MW hydroelectric power plant in Saratoga County, New York, operated by GR Catalyst One, LLC. It has 2 generating units here, inside NYISO. Its units entered service in 1993.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
3.4 MW
3.4 MW net summer
Generating units
2
In service
1993
Plant code
54395

Where it is

Loading map…
County
Saratoga County, New York
Coordinates
42.9375, -73.6544
Balancing authority
NYIS
Sector
IPP Non-CHP

Units, technology and status

Operator of record
GR Catalyst One, LLC
Primary energy source
Hydro
Technologies
Conventional Hydroelectric
Status
Operating

Stillwater Hydro Electric Project: FAQ

Where is Stillwater Hydro Electric Project?
In Saratoga County, New York (NY). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Stillwater Hydro Electric Project?
3 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns Stillwater Hydro Electric Project?
GR Catalyst One, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Stillwater Hydro Electric Project LLC?
Probably, but the plant data does not say. It records a plant name and an operator — GR Catalyst One, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Stillwater Hydro Electric Project LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Stillwater Hydro Electric Project still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.