Stillwater Hydro Electric Project
Stillwater Hydro Electric Project is a 3 MW hydroelectric power plant in Saratoga County, New York, operated by GR Catalyst One, LLC. It has 2 generating units here, inside NYISO. Its units entered service in 1993.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 3.4 MW
- 3.4 MW net summer
- Generating units
- 2
- In service
- 1993
- Plant code
- 54395
Where it is
Loading map…
- County
- Saratoga County, New York
- Coordinates
- 42.9375, -73.6544
- Balancing authority
- NYIS
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- GR Catalyst One, LLC
- Primary energy source
- Hydro
- Technologies
- Conventional Hydroelectric
- Status
- Operating
Stillwater Hydro Electric Project: FAQ
- Where is Stillwater Hydro Electric Project?
- In Saratoga County, New York (NY). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Stillwater Hydro Electric Project?
- 3 MW of nameplate capacity across 2 units, as of 2026-07.
- Who owns Stillwater Hydro Electric Project?
- GR Catalyst One, LLC is the operator of record. That is not always the ultimate owner.
- Is this the same as Stillwater Hydro Electric Project LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — GR Catalyst One, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Stillwater Hydro Electric Project LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Stillwater Hydro Electric Project still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.