Tieton Dam Hydro Electric Project

Tieton Dam Hydro Electric Project is a 14 MW hydroelectric power plant in Yakima County, Washington, operated by City of Burbank Water and Power - (CA). EIA-860M lists 2 generating units here. Its units entered service in 2006.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
13.8 MW
13.8 MW net summer
Generating units
2
In service
2006
EIA plant ID
57496

Where it is

Loading map…
County
Yakima County, Washington
Coordinates
46.658, -121.1287
Balancing authority
PACW
Sector
Electric Utility

Units, technology and status

Operator of record
City of Burbank Water and Power - (CA)
Primary energy source
Hydro
Technologies
Conventional Hydroelectric
Status
Operating

Every plant City of Burbank Water and Power - (CA) reports to EIA →

Tieton Dam Hydro Electric Project: FAQ

Where is Tieton Dam Hydro Electric Project?
In Yakima County, Washington (WA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Tieton Dam Hydro Electric Project?
14 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Tieton Dam Hydro Electric Project?
EIA-860M names City of Burbank Water and Power - (CA) as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Tieton Dam Hydro Electric Project LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — City of Burbank Water and Power - (CA) here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Tieton Dam Hydro Electric Project LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Tieton Dam Hydro Electric Project still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.