Swift 2
Swift 2 is a 72 MW hydroelectric power plant in Cowlitz County, Washington, operated by PacifiCorp. EIA-860M lists 2 generating units here. Its units entered service between 1958 and 1959.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 72 MW
- 65 MW net summer
- Generating units
- 2
- In service
- 1958–1959
- EIA plant ID
- 6265
Where it is
Loading map…
- County
- Cowlitz County, Washington
- Coordinates
- 46.0594, -122.2594
- Balancing authority
- PACW
- Sector
- Electric Utility
Units, technology and status
- Operator of record
- PacifiCorp
- Primary energy source
- Hydro
- Technologies
- Conventional Hydroelectric
- Status
- Out of service and NOT expected to return to service in next calendar year
Swift 2: FAQ
- Where is Swift 2?
- In Cowlitz County, Washington (WA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is Swift 2?
- 72 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
- Who owns Swift 2?
- EIA-860M names PacifiCorp as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as Swift 2 LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — PacifiCorp here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Swift 2 LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is Swift 2 still running?
- EIA-860M files it as "Out of service and NOT expected to return to service in next calendar year" for 2026-07. Statuses change monthly, and this page follows the monthly release.