Nuclear Power Plants in Nebraska

Every operating nuclear power plant in Nebraska as of 2026-07: 1 plants, 1 reactors and 801 MW of nameplate capacity across 1 county, most of it inside SPP.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Plants
1
1 generating units
Nameplate capacity
801 MW
Counties
1
Grid operator
SPP
covers most of these plants

Map of nuclear power plants in Nebraska

Every one of the 1 plants is drawn at its reported coordinates.

Loading map…
  • Nuclear · 1

List of nuclear power plants in Nebraska

Sort by any column. Capacity is nameplate, summed across every generating unit at the site.

nuclear power plants in Nebraska
Cooper Nuclear StationNuclearNebraska Public Power DistrictNemaha80111974Operating

Largest nuclear power plants in Nebraska

  1. 1Cooper Nuclear StationNemaha County, Nebraska801 MW

Nuclear power plants by county in Nebraska

The county each plant sits in. It is the fastest way to find the plant nearest a given town.

CountyPlantsNameplate MW
Nemaha1801

Nuclear Power Plants in Nebraska: FAQ

How many nuclear power plants are in Nebraska?
1, with 801 MW of nameplate capacity between them, spread over 1 county. That is the operating count as of 2026-07.
Is there a map of Nebraska nuclear power plants?
Yes — the map above. Each dot is one nuclear power plant, sized by nameplate capacity and placed at its reported site.
Which is the largest nuclear power plant in Nebraska?
Cooper Nuclear Station, at 801 MW. The table is sorted largest first, so the rest follow it.
Is there a nuclear power plant near me in Nebraska?
The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
Which grid operator runs Nebraska's nuclear power plants?
Most of them sit inside SPP, going by the balancing authority each plant is assigned to. Live conditions for that market are on this site.
How current is this, and what is left out?