Nuclear Power Plants in Nebraska
Every operating nuclear power plant in Nebraska on EIA-860M for 2026-07: 1 plants, 1 reactors and 801 MW of nameplate capacity across 1 county, most of it inside SPP.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Plants
- 1
- 1 generating units
- Nameplate capacity
- 801 MW
- Counties
- 1
- Grid operator
- SPP
- covers most of these plants
Map of nuclear power plants in Nebraska
Every one of the 1 plants is drawn at the coordinate EIA files for it.
Loading map…
- Nuclear · 1
List of nuclear power plants in Nebraska
Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.
| Cooper Nuclear StationNuclear | Nebraska Public Power District | Nemaha | 801 | 1 | 1974 | Operating |
Largest nuclear power plants in Nebraska
- 1Cooper Nuclear StationNemaha County, Nebraska801 MW
Nuclear power plants by county in Nebraska
The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.
| County | Plants | Nameplate MW |
|---|---|---|
| Nemaha | 1 | 801 |
Nuclear Power Plants in Nebraska: FAQ
- How many nuclear power plants are in Nebraska?
- 1, with 801 MW of nameplate capacity between them, spread over 1 county. That is the EIA-860M operating count for 2026-07.
- Is there a map of Nebraska nuclear power plants?
- Yes — the map above. Each dot is one nuclear power plant, sized by nameplate capacity and placed at the coordinates EIA files for it.
- Which is the largest nuclear power plant in Nebraska?
- Cooper Nuclear Station, at 801 MW. The table is sorted largest first, so the rest follow it.
- Is there a nuclear power plant near me in Nebraska?
- The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
- Which grid operator runs Nebraska's nuclear power plants?
- Most of them sit inside SPP, according to the balancing-authority code EIA files against each plant. Live conditions for that market are on this site.
- How current is this, and what is left out?
- EIA-860M for 2026-07. EIA technology "Nuclear" — commercial reactors reporting on EIA-860M. Plants below 1 MW are not surveyed by EIA and so are absent; retirements and additions after 2026-07 arrive with the next monthly release.