Oil-Fired Power Plants in Arizona

Every operating oil-fired power plant in Arizona on EIA-860M for 2026-07: 1 plants, 1 generating units and 26 MW of nameplate capacity across 1 county.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Plants
1
1 generating units
Nameplate capacity
26 MW
Counties
1
Grid operator
Mixed
no single ISO covers a majority

Map of oil-fired power plants in Arizona

Every one of the 1 plants is drawn at the coordinate EIA files for it.

Loading map…
  • Petroleum · 1

List of oil-fired power plants in Arizona

Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.

oil-fired power plants in Arizona
DouglasPetroleum LiquidsArizona Public Service CoCochise26.111972Operating

Largest oil-fired power plants in Arizona

  1. 1DouglasCochise County, Arizona26.1 MW

Oil-fired power plants by county in Arizona

The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.

CountyPlantsNameplate MW
Cochise126.1

Oil-Fired Power Plants in Arizona: FAQ

How many oil-fired power plants are in Arizona?
1, with 26 MW of nameplate capacity between them, spread over 1 county. That is the EIA-860M operating count for 2026-07.
Is there a map of Arizona oil-fired power plants?
Yes — the map above. Each dot is one oil-fired power plant, sized by nameplate capacity and placed at the coordinates EIA files for it.
Which is the largest oil-fired power plant in Arizona?
Douglas, at 26 MW. The table is sorted largest first, so the rest follow it.
Is there a oil-fired power plant near me in Arizona?
The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
Which grid operator runs Arizona's oil-fired power plants?
No single ISO or RTO covers most of them. EIA files each plant against its own balancing authority, which in Arizona is largely a vertically integrated utility rather than an organised market.
How current is this, and what is left out?
EIA-860M for 2026-07. Petroleum liquids and petroleum coke. Many are peakers or standby units. Plants below 1 MW are not surveyed by EIA and so are absent; retirements and additions after 2026-07 arrive with the next monthly release.