Oil-Fired Power Plants in Kentucky

Every operating oil-fired power plant in Kentucky on EIA-860M for 2026-07: 1 plants, 6 generating units and 11 MW of nameplate capacity across 1 county.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Plants
1
6 generating units
Nameplate capacity
11 MW
Counties
1
Grid operator
Mixed
no single ISO covers a majority

Map of oil-fired power plants in Kentucky

Every one of the 1 plants is drawn at the coordinate EIA files for it.

Loading map…
  • Petroleum · 1

List of oil-fired power plants in Kentucky

Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.

oil-fired power plants in Kentucky
Paris (KY)Petroleum LiquidsCity of Paris - (KY)Bourbon10.661934Operating

Largest oil-fired power plants in Kentucky

  1. 1Paris (KY)Bourbon County, Kentucky10.6 MW

Oil-fired power plants by county in Kentucky

The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.

CountyPlantsNameplate MW
Bourbon110.6

Oil-Fired Power Plants in Kentucky: FAQ

How many oil-fired power plants are in Kentucky?
1, with 11 MW of nameplate capacity between them, spread over 1 county. That is the EIA-860M operating count for 2026-07.
Is there a map of Kentucky oil-fired power plants?
Yes — the map above. Each dot is one oil-fired power plant, sized by nameplate capacity and placed at the coordinates EIA files for it.
Which is the largest oil-fired power plant in Kentucky?
Paris (KY), at 11 MW. The table is sorted largest first, so the rest follow it.
Is there a oil-fired power plant near me in Kentucky?
The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
Which grid operator runs Kentucky's oil-fired power plants?
No single ISO or RTO covers most of them. EIA files each plant against its own balancing authority, which in Kentucky is largely a vertically integrated utility rather than an organised market.
How current is this, and what is left out?
EIA-860M for 2026-07. Petroleum liquids and petroleum coke. Many are peakers or standby units. Plants below 1 MW are not surveyed by EIA and so are absent; retirements and additions after 2026-07 arrive with the next monthly release.