Every operating oil-fired power plant in Mississippi on EIA-860M for 2026-07: 1 plants, 5 generating units and 9 MW of nameplate capacity across 1 county.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Plants
1
5 generating units
Nameplate capacity
9 MW
Counties
1
Grid operator
Mixed
no single ISO covers a majority

Map of oil-fired power plants in Mississippi

Every one of the 1 plants is drawn at the coordinate EIA files for it.

Loading map…
  • Petroleum · 1

List of oil-fired power plants in Mississippi

Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.

oil-fired power plants in Mississippi
MeridianPetroleum LiquidsTennessee Valley AuthorityLauderdale951998Operating

Largest oil-fired power plants in Mississippi

  1. 1MeridianLauderdale County, Mississippi9 MW

Oil-fired power plants by county in Mississippi

The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.

CountyPlantsNameplate MW
Lauderdale19

Oil-Fired Power Plants in Mississippi: FAQ

How many oil-fired power plants are in Mississippi?
1, with 9 MW of nameplate capacity between them, spread over 1 county. That is the EIA-860M operating count for 2026-07.
Is there a map of Mississippi oil-fired power plants?
Yes — the map above. Each dot is one oil-fired power plant, sized by nameplate capacity and placed at the coordinates EIA files for it.
Which is the largest oil-fired power plant in Mississippi?
Meridian, at 9 MW. The table is sorted largest first, so the rest follow it.
Is there a oil-fired power plant near me in Mississippi?
The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
Which grid operator runs Mississippi's oil-fired power plants?
No single ISO or RTO covers most of them. EIA files each plant against its own balancing authority, which in Mississippi is largely a vertically integrated utility rather than an organised market.
How current is this, and what is left out?
EIA-860M for 2026-07. Petroleum liquids and petroleum coke. Many are peakers or standby units. Plants below 1 MW are not surveyed by EIA and so are absent; retirements and additions after 2026-07 arrive with the next monthly release.