Oil-Fired Power Plants in Nevada

Every operating oil-fired power plant in Nevada as of 2026-07: 1 plants, 3 generating units and 6 MW of nameplate capacity across 1 county.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Plants
1
3 generating units
Nameplate capacity
6 MW
Counties
1
Grid operator
Mixed
no single ISO covers a majority

Map of oil-fired power plants in Nevada

Every one of the 1 plants is drawn at its reported coordinates.

Loading map…
  • Petroleum · 1

List of oil-fired power plants in Nevada

Sort by any column. Capacity is nameplate, summed across every generating unit at the site.

oil-fired power plants in Nevada
BrunswickPetroleum LiquidsSierra Pacific Power CoCarson City631960Out of service and NOT expected to return to service in next calendar year

Largest oil-fired power plants in Nevada

  1. 1BrunswickCarson City County, Nevada6 MW

Oil-fired power plants by county in Nevada

The county each plant sits in. It is the fastest way to find the plant nearest a given town.

CountyPlantsNameplate MW
Carson City16

Oil-Fired Power Plants in Nevada: FAQ

How many oil-fired power plants are in Nevada?
1, with 6 MW of nameplate capacity between them, spread over 1 county. That is the operating count as of 2026-07.
Is there a map of Nevada oil-fired power plants?
Yes — the map above. Each dot is one oil-fired power plant, sized by nameplate capacity and placed at its reported site.
Which is the largest oil-fired power plant in Nevada?
Brunswick, at 6 MW. The table is sorted largest first, so the rest follow it.
Is there a oil-fired power plant near me in Nevada?
The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
Which grid operator runs Nevada's oil-fired power plants?
No single ISO or RTO covers most of them. Each plant belongs to its own balancing authority, which in Nevada is largely a vertically integrated utility rather than an organised market.
How current is this, and what is left out?
Data as of 2026-07, updated monthly. Petroleum liquids and petroleum coke. Many are peakers or standby units. Plants below 1 MW are not included; retirements and additions after 2026-07 arrive with the next monthly update.