Intel - Ocotillo Campus Solar

Intel - Ocotillo Campus Solar is a 4 MW solar farm in Maricopa County, Arizona, operated by Tesla Inc.. EIA-860M lists 2 generating units here. Its units entered service between 2017 and 2018.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
4.2 MW
4.2 MW net summer
Generating units
2
In service
2017–2018
EIA plant ID
60822

Where it is

Loading map…
County
Maricopa County, Arizona
Coordinates
33.2433, -111.8924
Balancing authority
AZPS
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Tesla Inc.
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Tesla Inc. reports to EIA →

Intel - Ocotillo Campus Solar: FAQ

Where is Intel - Ocotillo Campus Solar?
In Maricopa County, Arizona (AZ). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Intel - Ocotillo Campus Solar?
4 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Intel - Ocotillo Campus Solar?
EIA-860M names Tesla Inc. as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Intel - Ocotillo Campus Solar LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Tesla Inc. here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Intel - Ocotillo Campus Solar LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Intel - Ocotillo Campus Solar still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.