UADA

UADA is a 3 MW solar farm in Howard County, Arkansas, operated by Entegrity Solar UA AG, LLC. EIA-860M lists 1 generating unit here, inside SPP. Its unit entered service in 2023.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
2.8 MW
2.8 MW net summer
Generating units
1
In service
2023
EIA plant ID
67526

Where it is

Loading map…
County
Howard County, Arkansas
Coordinates
33.9266, -93.8589
Balancing authority
SWPP
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Entegrity Solar UA AG, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Entegrity Solar UA AG, LLC reports to EIA →

UADA: FAQ

Where is UADA?
In Howard County, Arkansas (AR). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is UADA?
3 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns UADA?
EIA-860M names Entegrity Solar UA AG, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as UADA LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Entegrity Solar UA AG, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "UADA LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is UADA still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.