Adelanto Solar Project

Adelanto Solar Project is a 7 MW solar farm in San Bernardino County, California, operated by Los Angeles Department of Water & Power. It has 1 generating unit here. Its unit entered service in 2012.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
6.8 MW
6.8 MW net summer
Generating units
1
In service
2012
Plant code
57305

Where it is

Loading map…
County
San Bernardino County, California
Coordinates
34.5508, -117.4353
Balancing authority
LDWP
Sector
Electric Utility

Units, technology and status

Operator of record
Los Angeles Department of Water & Power
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Los Angeles Department of Water & Power →

Adelanto Solar Project: FAQ

Where is Adelanto Solar Project?
In San Bernardino County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Adelanto Solar Project?
7 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Adelanto Solar Project?
Los Angeles Department of Water & Power is the operator of record. That is not always the ultimate owner.
Is this the same as Adelanto Solar Project LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Los Angeles Department of Water & Power here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Adelanto Solar Project LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Adelanto Solar Project still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.