McCoy Solar Energy Project Hybrid

McCoy Solar Energy Project Hybrid is a 501 MW solar farm in Riverside County, California, operated by McCoy Solar, LLC. EIA-860M lists 9 generating units here, inside CAISO. Its units entered service between 2015 and 2021.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
500.6 MW
500.6 MW net summer
Generating units
9
In service
2015–2021
EIA plant ID
58462

Where it is

Loading map…
County
Riverside County, California
Coordinates
33.6947, -114.7397
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
McCoy Solar, LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Solar 271 MW, Battery 230 MW. It is filed here under Solar, the source with the most capacity.

Every plant McCoy Solar, LLC reports to EIA →

McCoy Solar Energy Project Hybrid: FAQ

Where is McCoy Solar Energy Project Hybrid?
In Riverside County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is McCoy Solar Energy Project Hybrid?
501 MW of nameplate capacity across 9 units, as of the EIA-860M release for 2026-07.
Who owns McCoy Solar Energy Project Hybrid?
EIA-860M names McCoy Solar, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as McCoy Solar Energy Project Hybrid LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — McCoy Solar, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "McCoy Solar Energy Project Hybrid LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is McCoy Solar Energy Project Hybrid still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.