McCoy Solar Energy Project Hybrid
McCoy Solar Energy Project Hybrid is a 501 MW solar farm in Riverside County, California, operated by McCoy Solar, LLC. EIA-860M lists 9 generating units here, inside CAISO. Its units entered service between 2015 and 2021.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 500.6 MW
- 500.6 MW net summer
- Generating units
- 9
- In service
- 2015–2021
- EIA plant ID
- 58462
Where it is
Loading map…
- County
- Riverside County, California
- Coordinates
- 33.6947, -114.7397
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- McCoy Solar, LLC
- Primary energy source
- Solar
- Technologies
- Batteries, Solar Photovoltaic
- Status
- Operating
This site runs on more than one energy source. EIA-860M capacity splits: Solar 271 MW, Battery 230 MW. It is filed here under Solar, the source with the most capacity.
McCoy Solar Energy Project Hybrid: FAQ
- Where is McCoy Solar Energy Project Hybrid?
- In Riverside County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is McCoy Solar Energy Project Hybrid?
- 501 MW of nameplate capacity across 9 units, as of the EIA-860M release for 2026-07.
- Who owns McCoy Solar Energy Project Hybrid?
- EIA-860M names McCoy Solar, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as McCoy Solar Energy Project Hybrid LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — McCoy Solar, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "McCoy Solar Energy Project Hybrid LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is McCoy Solar Energy Project Hybrid still running?
- EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.