Solar Borrego I

Solar Borrego I is a 26 MW solar farm in San Diego County, California, operated by NRG Solar Borrego I. EIA-860M lists 1 generating unit here, inside CAISO. Its unit entered service in 2013.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
26 MW
26 MW net summer
Generating units
1
In service
2013
EIA plant ID
57455

Where it is

Loading map…
County
San Diego County, California
Coordinates
33.2989, -116.3508
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
NRG Solar Borrego I
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant NRG Solar Borrego I reports to EIA →

Solar Borrego I: FAQ

Where is Solar Borrego I?
In San Diego County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Solar Borrego I?
26 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Solar Borrego I?
EIA-860M names NRG Solar Borrego I as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Solar Borrego I LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — NRG Solar Borrego I here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Solar Borrego I LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Solar Borrego I still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.