Butte College Main Campus Solar
Butte College Main Campus Solar is a 4 MW solar farm in Butte County, California, operated by Butte-Glenn Community College District. It has 1 generating unit here, inside CAISO. Its unit entered service in 2011.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 3.5 MW
- 4.1 MW net summer
- Generating units
- 1
- In service
- 2011
- Plant code
- 57970
Where it is
Loading map…
- County
- Butte County, California
- Coordinates
- 39.6481, -121.6442
- Balancing authority
- CISO
- Sector
- Commercial Non-CHP
Units, technology and status
- Operator of record
- Butte-Glenn Community College District
- Primary energy source
- Solar
- Technologies
- Solar Photovoltaic
- Status
- Operating
Butte College Main Campus Solar: FAQ
- Where is Butte College Main Campus Solar?
- In Butte County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Butte College Main Campus Solar?
- 4 MW of nameplate capacity across 1 unit, as of 2026-07.
- Who owns Butte College Main Campus Solar?
- Butte-Glenn Community College District is the operator of record. That is not always the ultimate owner.
- Is this the same as Butte College Main Campus Solar LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — Butte-Glenn Community College District here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Butte College Main Campus Solar LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Butte College Main Campus Solar still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.