Heber Solar

Heber Solar is a 11 MW solar farm in Imperial County, California, operated by Axium US Solar Holdings LLC. EIA-860M lists 1 generating unit here. Its unit entered service in 2014.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
10.9 MW
10 MW net summer
Generating units
1
In service
2014
EIA plant ID
58398

Where it is

Loading map…
County
Imperial County, California
Coordinates
32.7125, -115.5406
Balancing authority
IID
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Axium US Solar Holdings LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Axium US Solar Holdings LLC reports to EIA →

Heber Solar: FAQ

Where is Heber Solar?
In Imperial County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Heber Solar?
11 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Heber Solar?
EIA-860M names Axium US Solar Holdings LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Heber Solar LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Axium US Solar Holdings LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Heber Solar LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Heber Solar still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.