CSU Northridge Plant

CSU Northridge Plant is a 1 MW solar farm in Los Angeles County, California, operated by California State University, Northridge. It has 3 generating units here. Its units entered service between 2003 and 2025.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
1.3 MW
1.1 MW net summer
Generating units
3
In service
2003–2025
Plant code
58422

Where it is

Loading map…
County
Los Angeles County, California
Coordinates
34.2433, -118.5306
Balancing authority
LDWP
Sector
Commercial Non-CHP

Units, technology and status

Operator of record
California State University, Northridge
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

CSU Northridge Plant: FAQ

Where is CSU Northridge Plant?
In Los Angeles County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is CSU Northridge Plant?
1 MW of nameplate capacity across 3 units, as of 2026-07.
Who owns CSU Northridge Plant?
California State University, Northridge is the operator of record. That is not always the ultimate owner.
Is this the same as CSU Northridge Plant LLC?
Probably, but the plant data does not say. It records a plant name and an operator — California State University, Northridge here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "CSU Northridge Plant LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is CSU Northridge Plant still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.