Eland Solar & Storage Center, Phase 1 Hy

Eland Solar & Storage Center, Phase 1 Hy is a 460 MW solar farm in Kern County, California, operated by 68SF 8me LLC. EIA-860M lists 2 generating units here. Its units entered service in 2024.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
459.6 MW
350 MW net summer
Generating units
2
In service
2024
EIA plant ID
61168

Where it is

Loading map…
County
Kern County, California
Coordinates
35.2237, -117.977
Balancing authority
LDWP
Sector
IPP Non-CHP

Units, technology and status

Operator of record
68SF 8me LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Solar 310 MW, Battery 150 MW. It is filed here under Solar, the source with the most capacity.

Every plant 68SF 8me LLC reports to EIA →

Eland Solar & Storage Center, Phase 1 Hy: FAQ

Where is Eland Solar & Storage Center, Phase 1 Hy?
In Kern County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Eland Solar & Storage Center, Phase 1 Hy?
460 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Eland Solar & Storage Center, Phase 1 Hy?
EIA-860M names 68SF 8me LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Eland Solar & Storage Center, Phase 1 Hy LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — 68SF 8me LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Eland Solar & Storage Center, Phase 1 Hy LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Eland Solar & Storage Center, Phase 1 Hy still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.