Expressway Solar C2

Expressway Solar C2 is a 2 MW solar farm in San Bernardino County, California, operated by AES Distributed Energy. It has 1 generating unit here, inside CAISO. Its unit entered service in 2014.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
1.5 MW
1.5 MW net summer
Generating units
1
In service
2014
Plant code
58763

Where it is

Loading map…
County
San Bernardino County, California
Coordinates
34.5844, -117.3414
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
AES Distributed Energy
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by AES Distributed Energy →

Expressway Solar C2: FAQ

Where is Expressway Solar C2?
In San Bernardino County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Expressway Solar C2?
2 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Expressway Solar C2?
AES Distributed Energy is the operator of record. That is not always the ultimate owner.
Is this the same as Expressway Solar C2 LLC?
Probably, but the plant data does not say. It records a plant name and an operator — AES Distributed Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Expressway Solar C2 LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Expressway Solar C2 still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.