Little Bear Solar 1, LLC

Little Bear Solar 1, LLC is a 40 MW solar farm in Fresno County, California, operated by Little Bear Solar 1, LLC (Longroad). EIA-860M lists 1 generating unit here, inside CAISO. Its unit entered service in 2020.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
40 MW
40 MW net summer
Generating units
1
In service
2020
EIA plant ID
59870

Where it is

Loading map…
County
Fresno County, California
Coordinates
36.716, -120.415
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Little Bear Solar 1, LLC (Longroad)
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Little Bear Solar 1, LLC (Longroad) reports to EIA →

Little Bear Solar 1, LLC: FAQ

Where is Little Bear Solar 1, LLC?
In Fresno County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Little Bear Solar 1, LLC?
40 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Little Bear Solar 1, LLC?
EIA-860M names Little Bear Solar 1, LLC (Longroad) as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is Little Bear Solar 1, LLC still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.