Central Antelope Dry Ranch C

Central Antelope Dry Ranch C is a 20 MW solar farm in Los Angeles County, California, operated by AES Distributed Energy. It has 1 generating unit here, inside CAISO. Its unit entered service in 2016.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
20 MW
17 MW net summer
Generating units
1
In service
2016
Plant code
59963

Where it is

Loading map…
County
Los Angeles County, California
Coordinates
34.7205, -118.3005
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
AES Distributed Energy
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by AES Distributed Energy →

Central Antelope Dry Ranch C: FAQ

Where is Central Antelope Dry Ranch C?
In Los Angeles County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Central Antelope Dry Ranch C?
20 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Central Antelope Dry Ranch C?
AES Distributed Energy is the operator of record. That is not always the ultimate owner.
Is this the same as Central Antelope Dry Ranch C LLC?
Probably, but the plant data does not say. It records a plant name and an operator — AES Distributed Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Central Antelope Dry Ranch C LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Central Antelope Dry Ranch C still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.