Adera Solar

Adera Solar is a 20 MW solar farm in Madera County, California, operated by AES Distributed Energy. It has 1 generating unit here, inside CAISO. Its unit entered service in 2015.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
20 MW
19 MW net summer
Generating units
1
In service
2015
Plant code
60027

Where it is

Loading map…
County
Madera County, California
Coordinates
37.1206, -120.3249
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
AES Distributed Energy
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by AES Distributed Energy →

Adera Solar: FAQ

Where is Adera Solar?
In Madera County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Adera Solar?
20 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Adera Solar?
AES Distributed Energy is the operator of record. That is not always the ultimate owner.
Is this the same as Adera Solar LLC?
Probably, but the plant data does not say. It records a plant name and an operator — AES Distributed Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Adera Solar LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Adera Solar still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.