Blythe Solar III, LLC Hybrid

Blythe Solar III, LLC Hybrid is a 252 MW solar farm in Riverside County, California, operated by Blythe Solar III, LLC. EIA-860M lists 2 generating units here, inside CAISO. Its units entered service between 2020 and 2021.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
251.8 MW
251.8 MW net summer
Generating units
2
In service
2020–2021
EIA plant ID
60094

Where it is

Loading map…
County
Riverside County, California
Coordinates
33.656, -114.742
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Blythe Solar III, LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Solar 137 MW, Battery 115 MW. It is filed here under Solar, the source with the most capacity.

Every plant Blythe Solar III, LLC reports to EIA →

Blythe Solar III, LLC Hybrid: FAQ

Where is Blythe Solar III, LLC Hybrid?
In Riverside County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Blythe Solar III, LLC Hybrid?
252 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Blythe Solar III, LLC Hybrid?
EIA-860M names Blythe Solar III, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Blythe Solar III, LLC Hybrid LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Blythe Solar III, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Blythe Solar III, LLC Hybrid LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Blythe Solar III, LLC Hybrid still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.