Blythe Solar III, LLC Hybrid

Blythe Solar III, LLC Hybrid is a 252 MW solar farm in Riverside County, California, operated by Blythe Solar III, LLC. It has 2 generating units here, inside CAISO. Its units entered service between 2020 and 2021.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
251.8 MW
251.8 MW net summer
Generating units
2
In service
2020–2021
Plant code
60094

Where it is

Loading map…
County
Riverside County, California
Coordinates
33.656, -114.742
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Blythe Solar III, LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. Capacity splits: Solar 137 MW, Battery 115 MW. It is listed here under Solar, the energy source with the most capacity.

Blythe Solar III, LLC Hybrid: FAQ

Where is Blythe Solar III, LLC Hybrid?
In Riverside County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Blythe Solar III, LLC Hybrid?
252 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns Blythe Solar III, LLC Hybrid?
Blythe Solar III, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Blythe Solar III, LLC Hybrid LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Blythe Solar III, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Blythe Solar III, LLC Hybrid LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Blythe Solar III, LLC Hybrid still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.