San Joaquin Solar

San Joaquin Solar is a 21 MW solar farm in Fresno County, California, operated by GASNA 6P, LLC. It has 2 generating units here, inside CAISO. Its units entered service between 2018 and 2019.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
21.3 MW
20 MW net summer
Generating units
2
In service
2018–2019
Plant code
60678

Where it is

Loading map…
County
Fresno County, California
Coordinates
36.5272, -120.1479
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
GASNA 6P, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

San Joaquin Solar: FAQ

Where is San Joaquin Solar?
In Fresno County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is San Joaquin Solar?
21 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns San Joaquin Solar?
GASNA 6P, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as San Joaquin Solar LLC?
Probably, but the plant data does not say. It records a plant name and an operator — GASNA 6P, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "San Joaquin Solar LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is San Joaquin Solar still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.