Antelope Expansion 2

Antelope Expansion 2 is a 105 MW solar farm in Los Angeles County, California, operated by AES Distributed Energy. EIA-860M lists 1 generating unit here, inside CAISO. Its unit entered service in 2018.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
105 MW
105 MW net summer
Generating units
1
In service
2018
EIA plant ID
61264

Where it is

Loading map…
County
Los Angeles County, California
Coordinates
34.745, -118.3092
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
AES Distributed Energy
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant AES Distributed Energy reports to EIA →

Antelope Expansion 2: FAQ

Where is Antelope Expansion 2?
In Los Angeles County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Antelope Expansion 2?
105 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Antelope Expansion 2?
EIA-860M names AES Distributed Energy as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Antelope Expansion 2 LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — AES Distributed Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Antelope Expansion 2 LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Antelope Expansion 2 still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.