Port of LA Solar FiT Project

Port of LA Solar FiT Project is a 1 MW solar farm in Los Angeles County, California, operated by Los Angeles Department of Water & Power. It has 1 generating unit here. Its unit entered service in 2015.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
1.1 MW
1.1 MW net summer
Generating units
1
In service
2015
Plant code
61319

Where it is

Loading map…
County
Los Angeles County, California
Coordinates
33.728, -118.28
Balancing authority
LDWP
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Los Angeles Department of Water & Power
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Los Angeles Department of Water & Power →

Port of LA Solar FiT Project: FAQ

Where is Port of LA Solar FiT Project?
In Los Angeles County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Port of LA Solar FiT Project?
1 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Port of LA Solar FiT Project?
Los Angeles Department of Water & Power is the operator of record. That is not always the ultimate owner.
Is this the same as Port of LA Solar FiT Project LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Los Angeles Department of Water & Power here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Port of LA Solar FiT Project LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Port of LA Solar FiT Project still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.