Antelope Expansion 3B

Antelope Expansion 3B is a 5 MW solar farm in Los Angeles County, California, operated by AES Distributed Energy. EIA-860M lists 1 generating unit here, inside CAISO. Its unit entered service in 2021.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
5 MW
5 MW net summer
Generating units
1
In service
2021
EIA plant ID
62674

Where it is

Loading map…
County
Los Angeles County, California
Coordinates
34.7202, -118.3225
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
AES Distributed Energy
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant AES Distributed Energy reports to EIA →

Antelope Expansion 3B: FAQ

Where is Antelope Expansion 3B?
In Los Angeles County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Antelope Expansion 3B?
5 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Antelope Expansion 3B?
EIA-860M names AES Distributed Energy as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Antelope Expansion 3B LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — AES Distributed Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Antelope Expansion 3B LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Antelope Expansion 3B still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.