Moonlight Packing - Phase 2

Moonlight Packing - Phase 2 is a 1 MW solar farm in Fresno County, California, operated by CalCom Energy. EIA-860M lists 1 generating unit here, inside CAISO. Its unit entered service in 2019.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
1.4 MW
1.4 MW net summer
Generating units
1
In service
2019
EIA plant ID
63514

Where it is

Loading map…
County
Fresno County, California
Coordinates
36.5858, -119.47
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
CalCom Energy
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant CalCom Energy reports to EIA →

Moonlight Packing - Phase 2: FAQ

Where is Moonlight Packing - Phase 2?
In Fresno County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Moonlight Packing - Phase 2?
1 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Moonlight Packing - Phase 2?
EIA-860M names CalCom Energy as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Moonlight Packing - Phase 2 LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — CalCom Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Moonlight Packing - Phase 2 LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Moonlight Packing - Phase 2 still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.