Golden Field Solar III, LLC

Golden Field Solar III, LLC is a 339 MW solar farm in Kern County, California, operated by Golden Fields Solar III, LLC. It has 2 generating units here, inside CAISO. Its units entered service between 2020 and 2024.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
339 MW
339 MW net summer
Generating units
2
In service
2020–2024
Plant code
63859

Where it is

Loading map…
County
Kern County, California
Coordinates
34.847, -118.395
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Golden Fields Solar III, LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. Capacity splits: Solar 192 MW, Battery 147 MW. It is listed here under Solar, the energy source with the most capacity.

Golden Field Solar III, LLC: FAQ

Where is Golden Field Solar III, LLC?
In Kern County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Golden Field Solar III, LLC?
339 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns Golden Field Solar III, LLC?
Golden Fields Solar III, LLC is the operator of record. That is not always the ultimate owner.
Is Golden Field Solar III, LLC still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.