Maverick Solar 6, LLC

Maverick Solar 6, LLC is a 150 MW solar farm in Riverside County, California, operated by Maverick Solar 6, LLC. It has 2 generating units here, inside CAISO. Its units entered service between 2021 and 2022.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
150 MW
150 MW net summer
Generating units
2
In service
2021–2022
Plant code
64105

Where it is

Loading map…
County
Riverside County, California
Coordinates
33.7, -115.38
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Maverick Solar 6, LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. Capacity splits: Solar 100 MW, Battery 50 MW. It is listed here under Solar, the energy source with the most capacity.

Maverick Solar 6, LLC: FAQ

Where is Maverick Solar 6, LLC?
In Riverside County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Maverick Solar 6, LLC?
150 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns Maverick Solar 6, LLC?
Maverick Solar 6, LLC is the operator of record. That is not always the ultimate owner.
Is Maverick Solar 6, LLC still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.