Arlington Energy Center II

Arlington Energy Center II is a 365 MW solar farm in Riverside County, California, operated by Arlington Energy Center II. It has 3 generating units here, inside CAISO. Its units entered service between 2022 and 2023.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
365 MW
365 MW net summer
Generating units
3
In service
2022–2023
Plant code
64481

Where it is

Loading map…
County
Riverside County, California
Coordinates
33.6909, -114.7749
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Arlington Energy Center II
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. Capacity splits: Solar 233 MW, Battery 132 MW. It is listed here under Solar, the energy source with the most capacity.

Arlington Energy Center II: FAQ

Where is Arlington Energy Center II?
In Riverside County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Arlington Energy Center II?
365 MW of nameplate capacity across 3 units, as of 2026-07.
Who owns Arlington Energy Center II?
Arlington Energy Center II is the operator of record. That is not always the ultimate owner.
Is this the same as Arlington Energy Center II LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Arlington Energy Center II here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Arlington Energy Center II LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Arlington Energy Center II still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.