Scarlet Solar (CA)
Scarlet Solar (CA) is a 240 MW solar farm in Fresno County, California, operated by EDP Renewables North America LLC. EIA-860M lists 2 generating units here, inside CAISO. Its units entered service in 2024.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 240 MW
- 240 MW net summer
- Generating units
- 2
- In service
- 2024
- EIA plant ID
- 64908
Where it is
Loading map…
- County
- Fresno County, California
- Coordinates
- 36.5975, -120.3623
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- EDP Renewables North America LLC
- Primary energy source
- Solar
- Technologies
- Batteries, Solar Photovoltaic
- Status
- Operating
This site runs on more than one energy source. EIA-860M capacity splits: Solar 200 MW, Battery 40 MW. It is filed here under Solar, the source with the most capacity.
Every plant EDP Renewables North America LLC reports to EIA →
Scarlet Solar (CA): FAQ
- Where is Scarlet Solar (CA)?
- In Fresno County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is Scarlet Solar (CA)?
- 240 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
- Who owns Scarlet Solar (CA)?
- EIA-860M names EDP Renewables North America LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as Scarlet Solar (CA) LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — EDP Renewables North America LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Scarlet Solar (CA) LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is Scarlet Solar (CA) still running?
- EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.