Scarlet Solar (CA)

Scarlet Solar (CA) is a 240 MW solar farm in Fresno County, California, operated by EDP Renewables North America LLC. EIA-860M lists 2 generating units here, inside CAISO. Its units entered service in 2024.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
240 MW
240 MW net summer
Generating units
2
In service
2024
EIA plant ID
64908

Where it is

Loading map…
County
Fresno County, California
Coordinates
36.5975, -120.3623
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
EDP Renewables North America LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Solar 200 MW, Battery 40 MW. It is filed here under Solar, the source with the most capacity.

Every plant EDP Renewables North America LLC reports to EIA →

Scarlet Solar (CA): FAQ

Where is Scarlet Solar (CA)?
In Fresno County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Scarlet Solar (CA)?
240 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Scarlet Solar (CA)?
EIA-860M names EDP Renewables North America LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Scarlet Solar (CA) LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — EDP Renewables North America LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Scarlet Solar (CA) LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Scarlet Solar (CA) still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.