Blythe Mesa Solar II

Blythe Mesa Solar II is a 336 MW solar farm in Riverside County, California, operated by Intersect USA, LLC. It has 2 generating units here, inside CAISO. Its units entered service in 2022.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
335.6 MW
335.6 MW net summer
Generating units
2
In service
2022
Plant code
65053

Where it is

Loading map…
County
Riverside County, California
Coordinates
33.6408, -114.6803
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Intersect USA, LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. Capacity splits: Solar 224 MW, Battery 112 MW. It is listed here under Solar, the energy source with the most capacity.

Every plant operated by Intersect USA, LLC →

Blythe Mesa Solar II: FAQ

Where is Blythe Mesa Solar II?
In Riverside County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Blythe Mesa Solar II?
336 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns Blythe Mesa Solar II?
Intersect USA, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Blythe Mesa Solar II LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Intersect USA, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Blythe Mesa Solar II LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Blythe Mesa Solar II still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.