Blythe Mesa Solar II
Blythe Mesa Solar II is a 336 MW solar farm in Riverside County, California, operated by Intersect USA, LLC. It has 2 generating units here, inside CAISO. Its units entered service in 2022.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 335.6 MW
- 335.6 MW net summer
- Generating units
- 2
- In service
- 2022
- Plant code
- 65053
Where it is
Loading map…
- County
- Riverside County, California
- Coordinates
- 33.6408, -114.6803
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Intersect USA, LLC
- Primary energy source
- Solar
- Technologies
- Batteries, Solar Photovoltaic
- Status
- Operating
This site runs on more than one energy source. Capacity splits: Solar 224 MW, Battery 112 MW. It is listed here under Solar, the energy source with the most capacity.
Blythe Mesa Solar II: FAQ
- Where is Blythe Mesa Solar II?
- In Riverside County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Blythe Mesa Solar II?
- 336 MW of nameplate capacity across 2 units, as of 2026-07.
- Who owns Blythe Mesa Solar II?
- Intersect USA, LLC is the operator of record. That is not always the ultimate owner.
- Is this the same as Blythe Mesa Solar II LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — Intersect USA, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Blythe Mesa Solar II LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Blythe Mesa Solar II still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.