Gilead Oceanside Solar Project

Gilead Oceanside Solar Project is a 2 MW solar farm in San Diego County, California, operated by Gilead Sciences Inc.. It has 2 generating units here, inside CAISO. Its units entered service in 2021.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
2.2 MW
2.1 MW net summer
Generating units
2
In service
2021
Plant code
65408

Where it is

Loading map…
County
San Diego County, California
Coordinates
33.2131, -117.3042
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Gilead Sciences Inc.
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. Capacity splits: Solar 2 MW, Battery 1 MW. It is listed here under Solar, the energy source with the most capacity.

Gilead Oceanside Solar Project: FAQ

Where is Gilead Oceanside Solar Project?
In San Diego County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Gilead Oceanside Solar Project?
2 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns Gilead Oceanside Solar Project?
Gilead Sciences Inc. is the operator of record. That is not always the ultimate owner.
Is this the same as Gilead Oceanside Solar Project LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Gilead Sciences Inc. here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Gilead Oceanside Solar Project LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Gilead Oceanside Solar Project still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.