Sealed Air Madera Solar Project

Sealed Air Madera Solar Project is a 4 MW solar farm in Madera County, California, operated by Sealed Air Corporation. EIA-860M lists 2 generating units here, inside CAISO. Its units entered service in 2022.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
3.8 MW
3.8 MW net summer
Generating units
2
In service
2022
EIA plant ID
65469

Where it is

Loading map…
County
Madera County, California
Coordinates
36.9456, -120.056
Balancing authority
CISO
Sector
Industrial Non-CHP

Units, technology and status

Operator of record
Sealed Air Corporation
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Solar 3 MW, Battery 1 MW. It is filed here under Solar, the source with the most capacity.

Every plant Sealed Air Corporation reports to EIA →

Sealed Air Madera Solar Project: FAQ

Where is Sealed Air Madera Solar Project?
In Madera County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Sealed Air Madera Solar Project?
4 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Sealed Air Madera Solar Project?
EIA-860M names Sealed Air Corporation as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Sealed Air Madera Solar Project LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Sealed Air Corporation here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Sealed Air Madera Solar Project LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Sealed Air Madera Solar Project still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.