Graniterock Quarry
Graniterock Quarry is a 4 MW solar farm in San Benito County, California, operated by CalCom Energy. EIA-860M lists 1 generating unit here, inside CAISO. Its unit entered service in 2022.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 4.4 MW
- 4.4 MW net summer
- Generating units
- 1
- In service
- 2022
- EIA plant ID
- 65485
Where it is
Loading map…
- County
- San Benito County, California
- Coordinates
- 36.8782, -121.6028
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- CalCom Energy
- Primary energy source
- Solar
- Technologies
- Solar Photovoltaic
- Status
- Operating
Graniterock Quarry: FAQ
- Where is Graniterock Quarry?
- In San Benito County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is Graniterock Quarry?
- 4 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
- Who owns Graniterock Quarry?
- EIA-860M names CalCom Energy as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as Graniterock Quarry LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — CalCom Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Graniterock Quarry LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is Graniterock Quarry still running?
- EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.