Edwards Sanborn E5
Edwards Sanborn E5 is a 115 MW solar farm in Kern County, California, operated by Terra-Gen Operating Co-Hybrid. It has 2 generating units here, inside CAISO. Its units entered service between 2022 and 2023.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 115 MW
- 115 MW net summer
- Generating units
- 2
- In service
- 2022–2023
- Plant code
- 65676
Where it is
Loading map…
- County
- Kern County, California
- Coordinates
- 34.9653, -118.0773
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Terra-Gen Operating Co-Hybrid
- Primary energy source
- Solar
- Technologies
- Batteries, Solar Photovoltaic
- Status
- Operating
This site runs on more than one energy source. Capacity splits: Solar 68 MW, Battery 47 MW. It is listed here under Solar, the energy source with the most capacity.
Edwards Sanborn E5: FAQ
- Where is Edwards Sanborn E5?
- In Kern County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Edwards Sanborn E5?
- 115 MW of nameplate capacity across 2 units, as of 2026-07.
- Who owns Edwards Sanborn E5?
- Terra-Gen Operating Co-Hybrid is the operator of record. That is not always the ultimate owner.
- Is this the same as Edwards Sanborn E5 LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — Terra-Gen Operating Co-Hybrid here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Edwards Sanborn E5 LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Edwards Sanborn E5 still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.