West Tambo Clean Power II

West Tambo Clean Power II is a 2 MW solar farm in Merced County, California, operated by West Tambo Clean Power II. EIA-860M lists 1 generating unit here, inside CAISO. Its unit entered service in 2024.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
2 MW
2 MW net summer
Generating units
1
In service
2024
EIA plant ID
66506

Where it is

Loading map…
County
Merced County, California
Coordinates
37.361, -120.7194
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
West Tambo Clean Power II
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant West Tambo Clean Power II reports to EIA →

West Tambo Clean Power II: FAQ

Where is West Tambo Clean Power II?
In Merced County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is West Tambo Clean Power II?
2 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns West Tambo Clean Power II?
EIA-860M names West Tambo Clean Power II as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as West Tambo Clean Power II LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — West Tambo Clean Power II here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "West Tambo Clean Power II LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is West Tambo Clean Power II still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.