Baldy Mesa 2_Silver Peak Hybrid

Baldy Mesa 2_Silver Peak Hybrid is a 75 MW solar farm in San Bernardino County, California, operated by AES Clean Energy. It has 2 generating units here, inside CAISO. Its units entered service in 2024.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
75 MW
75 MW net summer
Generating units
2
In service
2024
Plant code
66885

Where it is

Loading map…
County
San Bernardino County, California
Coordinates
34.6091, -117.4537
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
AES Clean Energy
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. Capacity splits: Solar 50 MW, Battery 25 MW. It is listed here under Solar, the energy source with the most capacity.

Every plant operated by AES Clean Energy →

Baldy Mesa 2_Silver Peak Hybrid: FAQ

Where is Baldy Mesa 2_Silver Peak Hybrid?
In San Bernardino County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Baldy Mesa 2_Silver Peak Hybrid?
75 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns Baldy Mesa 2_Silver Peak Hybrid?
AES Clean Energy is the operator of record. That is not always the ultimate owner.
Is this the same as Baldy Mesa 2_Silver Peak Hybrid LLC?
Probably, but the plant data does not say. It records a plant name and an operator — AES Clean Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Baldy Mesa 2_Silver Peak Hybrid LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Baldy Mesa 2_Silver Peak Hybrid still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.