Baldy Mesa 2_Silver Peak Hybrid

Baldy Mesa 2_Silver Peak Hybrid is a 75 MW solar farm in San Bernardino County, California, operated by AES Clean Energy. EIA-860M lists 2 generating units here, inside CAISO. Its units entered service in 2024.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
75 MW
75 MW net summer
Generating units
2
In service
2024
EIA plant ID
66885

Where it is

Loading map…
County
San Bernardino County, California
Coordinates
34.6091, -117.4537
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
AES Clean Energy
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Solar 50 MW, Battery 25 MW. It is filed here under Solar, the source with the most capacity.

Every plant AES Clean Energy reports to EIA →

Baldy Mesa 2_Silver Peak Hybrid: FAQ

Where is Baldy Mesa 2_Silver Peak Hybrid?
In San Bernardino County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Baldy Mesa 2_Silver Peak Hybrid?
75 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Baldy Mesa 2_Silver Peak Hybrid?
EIA-860M names AES Clean Energy as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Baldy Mesa 2_Silver Peak Hybrid LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — AES Clean Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Baldy Mesa 2_Silver Peak Hybrid LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Baldy Mesa 2_Silver Peak Hybrid still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.