Conflitti Solar

Conflitti Solar is a 4 MW solar farm in Fresno County, California, operated by CES Electron Farm One, LLC. EIA-860M lists 1 generating unit here, inside CAISO. Its unit entered service in 2026.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
4.4 MW
4.4 MW net summer
Generating units
1
In service
2026
EIA plant ID
66892

Where it is

Loading map…
County
Fresno County, California
Coordinates
36.6281, -120.5708
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
CES Electron Farm One, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant CES Electron Farm One, LLC reports to EIA →

Conflitti Solar: FAQ

Where is Conflitti Solar?
In Fresno County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Conflitti Solar?
4 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Conflitti Solar?
EIA-860M names CES Electron Farm One, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Conflitti Solar LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — CES Electron Farm One, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Conflitti Solar LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Conflitti Solar still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.