Conflitti Solar

Conflitti Solar is a 4 MW solar farm in Fresno County, California, operated by CES Electron Farm One, LLC. It has 1 generating unit here, inside CAISO. Its unit entered service in 2026.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
4.4 MW
4.4 MW net summer
Generating units
1
In service
2026
Plant code
66892

Where it is

Loading map…
County
Fresno County, California
Coordinates
36.6281, -120.5708
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
CES Electron Farm One, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Conflitti Solar: FAQ

Where is Conflitti Solar?
In Fresno County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Conflitti Solar?
4 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Conflitti Solar?
CES Electron Farm One, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Conflitti Solar LLC?
Probably, but the plant data does not say. It records a plant name and an operator — CES Electron Farm One, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Conflitti Solar LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Conflitti Solar still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.