Lemoore West

Lemoore West is a 8 MW solar farm in Kings County, California, operated by Leprino Foods. EIA-860M lists 1 generating unit here, inside CAISO. Its unit entered service in 2022.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
7.9 MW
7.9 MW net summer
Generating units
1
In service
2022
EIA plant ID
68027

Where it is

Loading map…
County
Kings County, California
Coordinates
36.3002, -119.8214
Balancing authority
CISO
Sector
Industrial Non-CHP

Units, technology and status

Operator of record
Leprino Foods
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Leprino Foods reports to EIA →

Lemoore West: FAQ

Where is Lemoore West?
In Kings County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Lemoore West?
8 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Lemoore West?
EIA-860M names Leprino Foods as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Lemoore West LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Leprino Foods here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Lemoore West LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Lemoore West still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.