CA OXNARD 2600 Sakioka Dr

CA OXNARD 2600 Sakioka Dr is a 3 MW solar farm in Ventura County, California, operated by Catalyze Oxnard 2600 Sakioka Drive Microgrid, LLC. EIA-860M lists 2 generating units here, inside CAISO. Its units entered service in 2025.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
3.2 MW
3.2 MW net summer
Generating units
2
In service
2025
EIA plant ID
68272

Where it is

Loading map…
County
Ventura County, California
Coordinates
34.2134, -119.1396
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Catalyze Oxnard 2600 Sakioka Drive Microgrid, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Catalyze Oxnard 2600 Sakioka Drive Microgrid, LLC reports to EIA →

CA OXNARD 2600 Sakioka Dr: FAQ

Where is CA OXNARD 2600 Sakioka Dr?
In Ventura County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is CA OXNARD 2600 Sakioka Dr?
3 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns CA OXNARD 2600 Sakioka Dr?
EIA-860M names Catalyze Oxnard 2600 Sakioka Drive Microgrid, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as CA OXNARD 2600 Sakioka Dr LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Catalyze Oxnard 2600 Sakioka Drive Microgrid, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "CA OXNARD 2600 Sakioka Dr LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is CA OXNARD 2600 Sakioka Dr still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.