Aratina Solar Center 1A

Aratina Solar Center 1A is a 195 MW solar farm in San Bernardino County, California, operated by 64NB 8me LLC. It has 2 generating units here, inside CAISO. Its units entered service in 2026.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
195 MW
195 MW net summer
Generating units
2
In service
2026
Plant code
68661

Where it is

Loading map…
County
San Bernardino County, California
Coordinates
34.988, -117.5716
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
64NB 8me LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. Capacity splits: Solar 120 MW, Battery 75 MW. It is listed here under Solar, the energy source with the most capacity.

Aratina Solar Center 1A: FAQ

Where is Aratina Solar Center 1A?
In San Bernardino County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Aratina Solar Center 1A?
195 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns Aratina Solar Center 1A?
64NB 8me LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Aratina Solar Center 1A LLC?
Probably, but the plant data does not say. It records a plant name and an operator — 64NB 8me LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Aratina Solar Center 1A LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Aratina Solar Center 1A still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.